尊龙凯时 - 人生就是搏!-z6com尊龙凯时人生就是搏z6com

En

Central heating project

Project Introduction

878,000 m2 heating project constructed in 2018

Eight Habell RE series new generation high efficiency air conditioning compressors are adopted to meet the temperature demand of customers. The overall operation condition is stable. The heating temperature demand is 42 for domestic water, 38.7 for hot water inlet, 43.4 for water outlet,  21.7 for hot water inlet and 15.7 for water outlet.

image.png

尊龙凯时人生就是搏z6com